Heated Chrome Towel Rail Bathroom Radiator Electric Straight Towel Warmer Wall Mounted Towel Rack Stainless Steel Towel Heater (Rose Gold Plug in)

★★★★★ 4.6 133 reviews

$240.99
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by aradominimarket.es
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
$240.99
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Apr 1
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by aradominimarket.es
Free 30-day returns Details

Product details

Management number 208426803 Release Date 2026/03/22 List Price $96.40 Model Number 208426803
Category

Welcome to choose the most suitable product for your home here. Why use a heated towel rail ? Effectively help towels eliminate odors. ? Keep towels dry to create a healthy and comfortable life for the family. ? In addition to hanging towels for daily use,our design also allows you to store additional towels. ? Suitable for different decorated rooms,kitchens,bathrooms and hotels. ? It is recommended to install it in a space that is not normally used,and there should be no extra space,and it is beautiful and generous. ? Easy to install. specification: Material: stainless steel Voltage: 110V-240V Heating time: 5 minutes Temperature: 45-55℃ Size: as shown The package includes: 1 X Electric Towel Warmer Rack (with mounting screws,towels and decorations not included) note: Due to manual measurement,please allow an error of 1-3cm and make sure you don‘t mind before ordering. Please understand that due to the different positions of the pictures,the colors may have chromatic aberrations.

  • ? The heated towel rail keeps towels dry and warm. Provide you with a comfortable experience in a wet and freezing day. Help eliminate unpleasant smells and keep the bathroom fresh.
  • ? The towel heater will reach the optimal temperature of 113131°F / 4555°C within 15 minutes. The builtin thermostat can safely maintain the temperature and.
  • ? The electric towel drying rack is made of stainless steel,which is easy to clean and install. It is easy to clean with a soft dry cloth when the towel rack is cold.
  • ? This wallmounted towel heater can help you save a lot of space through a compact design,which is very suitable for your apartment,dormitory and any other limited space.
  • heated towel rail heated towel rails for bathrooms bathroom radiator towel rail electric towel rail towel radiator bathroom radiator towel rail radiator electric towel radiator heated towel rail electric electric towel rails for bathrooms
Manufacturer QRXALISA

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.6 out of 5
★★★★★
133 ratings | 55 reviews
How item rating is calculated
View all reviews
5 stars
84% (112)
4 stars
3% (4)
3 stars
2% (3)
2 stars
1% (1)
1 star
10% (13)
Sort by

There are currently no written reviews for this product.